Advertisement
  • Contact Us
  • State News
  • National News
  • Legals
Subscribe For $3.50/month
Print Editions
Mountain Messenger
  • News
    • Local News
    • Courthouse
      • Civil Suits
      • Deeds
      • Marriages
      • Public Meetings
      • Reunions
    • Club News
    • Education
    • Business News
    • Entertainment
    • Sports News
  • Spiritual
    • Parabola
    • Southern Baptist
    • Transcendental Meditation
    • Diocese of Wheeling-Charleston
    • Church Bulletin
  • Obituaries
  • Columns
    • A Look Back
    • Back Down Country Roads
    • Dear Recycle Lady
    • Between The Lines
    • Letters to the Editor
  • eMessenger
  • Special Publications
    • Properties and Lifestyles
    • State Fair Guide
  • Legals
  • My Account
  • Login
  • FAQ
No Result
View All Result
  • News
    • Local News
    • Courthouse
      • Civil Suits
      • Deeds
      • Marriages
      • Public Meetings
      • Reunions
    • Club News
    • Education
    • Business News
    • Entertainment
    • Sports News
  • Spiritual
    • Parabola
    • Southern Baptist
    • Transcendental Meditation
    • Diocese of Wheeling-Charleston
    • Church Bulletin
  • Obituaries
  • Columns
    • A Look Back
    • Back Down Country Roads
    • Dear Recycle Lady
    • Between The Lines
    • Letters to the Editor
  • eMessenger
  • Special Publications
    • Properties and Lifestyles
    • State Fair Guide
  • Legals
  • My Account
  • Login
  • FAQ
No Result
View All Result
Mountain Messenger
No Result
View All Result

Ronceverte’s new waste water treatment plant taking shape

Peggy MacKenzie by Peggy MacKenzie
June 17, 2016
in Uncategorized
0
Workers have already removed topsoil and part of the next layer of dirt of the 90 by 192 foot site the reactor will occupy. With the help of a crane, shown above, a bucket loaded with concrete is used to fill in the basin of the VLR’s footprint. The construction project will eventually include three big concrete tanks, defined by the heavy-duty rebar shown sticking up 20-feet in the air.
Workers have already removed topsoil and part of the next layer of dirt of the 90 by 192 foot site the reactor will occupy. With the help of a crane, shown above, a bucket loaded with concrete is used to fill in the basin of the VLR’s footprint. The construction project will eventually include three big concrete tanks, defined by the heavy-duty rebar shown sticking up 20-feet in the air.

By Peggy Mackenzie

Bustling with activity, significant progress at Ronceverte’s waste water treatment plant is evident as it undergoes construction in preparation for the installation of the new vertical loop reactor (VLR). According to Project Engineer Eric Hartwell with Dunn Engineering, this is the first phase of a $24 million project to replace an aging treatment plant on the banks of the Greenbrier River. The plant is located on River Road across the river from the downtown area.

“The site is impressive,” said Ronceverte Mayor David Smith at the Monday night council meeting.

Dunn Engineer’s Elvis Canterbury, who serves as clerk of the works, together with contractor Terry Robinson with GM McCrossin Construction Co., are handling the construction process and expect the job to be completed by August of 2017.

The Ronceverte-owned sewer plant serves not only Ronceverte, but also Greenbrier County Public Service District No. 1, whose customer base includes Fairlea and Lewisburg.

 

Sign up for our free newsletter.

Enter your email address to receive weekly updates.

You will receive a confirmation email for your subscription. Please check your inbox and spam folder to complete the confirmation process.
Some fields are missing or incorrect!
Lists
Tags: The Greenbrier
Previous Post

Outdoor adventure magazine presents its stars for 2016

Next Post

Manchester issues MLK proclamation

Next Post
New art exhibits on display at Carnegie Hall

Manchester issues MLK proclamation

Sign up for our free newsletter.

Enter your email address to receive weekly updates.

You will receive a confirmation email for your subscription. Please check your inbox and spam folder to complete the confirmation process.
Some fields are missing or incorrect!
Lists
ADVERTISEMENT
  • National News
  • State News

© [year] Mountain Media News

  • Login
Forgot Password?
Lost your password? Please enter your username or email address. You will receive a link to create a new password via email.
body::-webkit-scrollbar { width: 7px; } body::-webkit-scrollbar-track { border-radius: 10px; background: #f0f0f0; } body::-webkit-scrollbar-thumb { border-radius: 50px; background: #dfdbdb }
No Result
View All Result
  • News
    • Local News
    • Courthouse
      • Civil Suits
      • Deeds
      • Marriages
      • Public Meetings
      • Reunions
    • Club News
    • Education
    • Business News
    • Entertainment
    • Sports News
  • Spiritual
    • Parabola
    • Southern Baptist
    • Transcendental Meditation
    • Diocese of Wheeling-Charleston
    • Church Bulletin
  • Obituaries
  • Columns
    • A Look Back
    • Back Down Country Roads
    • Dear Recycle Lady
    • Between The Lines
    • Letters to the Editor
  • eMessenger
  • Special Publications
    • Properties and Lifestyles
    • State Fair Guide
  • Legals
  • My Account
  • Login
  • FAQ

© [year] Mountain Media News